Recalls
Swim Platform
- Foam Removed
- Top Reinforced
- Through-Bolted to Main Hull for Support
- Drainpipe Added to Drain Swim Platform
- Trim Tabs Resealed
- Inspection Plates Added
Design Enhancements
Anchor Windlass
Moved aft to allow the full two-foot drop specified by the windlass manufacturer. This adjustment to the original Mainship design prevents line jamming and eliminates the need to "tail" the anchor line.
Samson Post added for secure tie-off
Samson Post added for secure tie-off
Stern Bilge Pump Discharge Pipe
Rerouted line from stringer to underside of deck to prevent reverse siphon found to occur in rough seas.
Batteries
House Battery Bank of 4 Golf-cart batteries added to support inverter and better accommodate overnight anchoring.
Lighting
Standard lighting replaced with LED lights in the following areas:
- Anchor Light
- Courtesy Lights
- Lower Helm
- Galley
- Master Stateroom
- Guest Stateroom
- Head
Other
- Teak shelves added in galley
- Teak shelf added in guest stateroom
- Straps mounted under bed in guest stateroom to facilitate access to under-bed storage
No comments:
Post a Comment